Requesting a Call:

8613506224031

Online Support

[email protected]

Visit Our Office

Jinfeng Sanxing Economic-developing-zone, Zhangjiagang City, Suzhou City, Jiangsu Province, China

Get a Free Quote

Our representative will contact you soon.
Email
Name
Country/Region
Company Name
Message
0/1000

SH Series Ribbon Mixer

Home >  Products >  Plastic Mixing Machine >  SH Series Ribbon Mixer

SH-B Series Ribbon Mixer

Applied for mixing and coloring of plastic pellets, powders, masterbatches, as well as various new materials and waste materials.
Stainless steel barrel manufacturing, with overall surface paint treatment.
Propeller blades adopt a double ribbon structure.
Reliable installation to ensure worker safety.
Equipped with a 0-30 minutes automatic shutdown system.

Product Description

SH Series Ribbon Mixer manufactureSH Series Ribbon Mixer factorySH Series Ribbon Mixer detailsSH Series Ribbon Mixer manufacture

 

Model

 

Motor(kW)

 

Mixing Capacity

(kg/h)

 

Rotating Speed (r/min)

Optional)

Electric

Heater(kW)

 

Dimensions (mm)

SH-B-H200

3

240

32

6

1600×680×1200

SH-B-H300

3

360

32

6

1850×680×1200

SH-B-H400

4

480

32

9

1650×880×1460

SH-B-H500

5.5

600

29

9

1850×880×1500

SH-B-H600

5.5

800

29

9

2050×880×1500

SH-B-H1000

11

1050

23

18

2900×1360×2100

SH-B-H2000

15

2100

23

24

3300×1660×2500

SH-B-H3000

22

3000

23

24

3780×1910×2700

SH-B-H6000

45

4200

19

36

4880×2250×2800

SH-B-H12000

75

8000

19

42

5980×2250×2900

Get a Free Quote

Our representative will contact you soon.
Email
Name
Country/Region
Company Name
Message
0/1000
  • As established in 1998, we are a national high-tech factory specializing in plastic industry.
  • Yes, the poducts quality is controlled under the ISO9001-2015 quality management system and CE European certification. The enterprise has received numerous national and provincial certifications and has established graduate cooperation stations with universities.
  • Our products come with a one-year warranty and lifetime technical support.
  • 30% TT down Payment,70% TT before Shipment. The delivery time depends on the product type. For production lines, the delivery period is generally 60–90 days, while for other standalone machines, it is 30–45 days.
  • We will dispatch 1 engineer from the seller to the buyer's factory for installation, commissioning and training, the buyer should be responsible for the cost of two-way flight tickets, the room and board and local area transportation, and allowance USD 80/day for the engineer. The customer has to supply skilled workers (mechanical fitters as well as electricians) in a sufficient number.

Get a Free Quote

Our representative will contact you soon.
Email
Name
Country/Region
Company Name
Message
0/1000

Related Search