Requesting a Call:

8613506224031

Online Support

[email protected]

Visit Our Office

Jinfeng Sanxing Economic-developing-zone, Zhangjiagang City, Suzhou City, Jiangsu Province, China

Get a Free Quote

Our representative will contact you soon.
Email
Name
Country/Region
Company Name
Message
0/1000
qy series haul off machine435-80

QY Series Haul-Off Machine

Home >  Products >  Plastic Auxiliary Machine >  QY Series Haul-Off Machine

QY Series Haul-Off Machine

QY series traction machine is an important supporting equipment for pipe production line, mainly used for continuous automatic traction of various pipe products. It is characterized by compact structure, stable transportation and wide adjustment range.

Product Description

QY Series Haul-Off Machine manufacture

QY Series Haul-Off Machine supplier

QY Series Haul-Off Machine manufacture

 

Model

 

Number of

Traction Claws

Traction Claw

Motor Power

(kW) and

Quantity

Tractor  Speed  (m/min)

Traction

Pipe

Diameter

Range

Traction

Machine

Center

Height (mm)

QY-2

2

1.5*2

2-10

Ø16- Ø110

1000

QY-3

3

1.1*3

1.2-6

Ø63- Ø250

1000

QY-4

4

1.1*4

0.6-3

Ø110- Ø315

1000

QY-6

6

0.75*6

0.4-2

Ø250- Ø630

1000-1100

QY-8

8

0.75*8

0.16-0.8

Ø400- Ø800

1000-1200

QY-10

10

0.75*10

0.3-0.6

Ø500- Ø1000

1000-1300

QY-12

12

0.75*12

0.06-0.3

Ø800- Ø1200

1300-1500

Get a Free Quote

Our representative will contact you soon.
Email
Name
Country/Region
Company Name
Message
0/1000
  • As established in 1998, we are a national high-tech factory specializing in plastic industry.
  • Yes, the poducts quality is controlled under the ISO9001-2015 quality management system and CE European certification. The enterprise has received numerous national and provincial certifications and has established graduate cooperation stations with universities.
  • Our products come with a one-year warranty and lifetime technical support.
  • 30% TT down Payment,70% TT before Shipment. The delivery time depends on the product type. For production lines, the delivery period is generally 60–90 days, while for other standalone machines, it is 30–45 days.
  • We will dispatch 1 engineer from the seller to the buyer's factory for installation, commissioning and training, the buyer should be responsible for the cost of two-way flight tickets, the room and board and local area transportation, and allowance USD 80/day for the engineer. The customer has to supply skilled workers (mechanical fitters as well as electricians) in a sufficient number.

Get a Free Quote

Our representative will contact you soon.
Email
Name
Country/Region
Company Name
Message
0/1000
qy series haul off machine435-86 qy series haul off machine435-87 qy series haul off machine435-88 qy series haul off machine435-89 qy series haul off machine435-90

Related Search