Requesting a Call:

8613506224031

Online Support

[email protected]

Visit Our Office

Jinfeng Sanxing Economic-developing-zone, Zhangjiagang City, Suzhou City, Jiangsu Province, China

Get a Free Quote

Our representative will contact you soon.
Email
Name
Country/Region
Company Name
Message
0/1000

Full-Automatic PVC Plastic Pipe Belling Machine

Home >  Products >  Plastic Auxiliary Machine >  Full-Automatic PVC Plastic Pipe Belling Machine

Full-Automatic PVC Plastic Pipe Belling Machine

The SGK series pipe belling machines include fully automatic and semi-automatic belling machines. These machines, used in conjunction with belling molds, can be directly integrated into plastic pipe production lines or used independently.

Product Description

Full-Automatic PVC Plastic Pipe Belling Machine details

Full-Automatic PVC Plastic Pipe Belling Machine supplier

Full-Automatic PVC Plastic Pipe Belling Machine manufacture

 Model

SGKS63

SGK250

SGK315

SGK400

SGK710

Pipe

Diameter(mm)

Φ20-63

 

Φ63-250

 

Φ110-315

 

Φ160-400

 

Φ315-710

 

Belling Method

Double

Pipe

 Vacuum

Cooling Method

Wind or Water

Heating

Power(kW)

 

4

 

4

 

7.2

 

15.6

 

25.4

Total Power(kW)

5.53

10.1

12.1

22

36.2

Get a Free Quote

Our representative will contact you soon.
Email
Name
Country/Region
Company Name
Message
0/1000
  • As established in 1998, we are a national high-tech factory specializing in plastic industry.
  • Yes, the poducts quality is controlled under the ISO9001-2015 quality management system and CE European certification. The enterprise has received numerous national and provincial certifications and has established graduate cooperation stations with universities.
  • Our products come with a one-year warranty and lifetime technical support.
  • 30% TT down Payment,70% TT before Shipment. The delivery time depends on the product type. For production lines, the delivery period is generally 60–90 days, while for other standalone machines, it is 30–45 days.
  • We will dispatch 1 engineer from the seller to the buyer's factory for installation, commissioning and training, the buyer should be responsible for the cost of two-way flight tickets, the room and board and local area transportation, and allowance USD 80/day for the engineer. The customer has to supply skilled workers (mechanical fitters as well as electricians) in a sufficient number.

Get a Free Quote

Our representative will contact you soon.
Email
Name
Country/Region
Company Name
Message
0/1000