Requesting a Call:

8613506224031

Online Support

[email protected]

Visit Our Office

Jinfeng Sanxing Economic-developing-zone, Zhangjiagang City, Suzhou City, Jiangsu Province, China

Get a Free Quote

Our representative will contact you soon.
Email
Name
Country/Region
Company Name
Message
0/1000

Extruding Hot Die Face Granulating Line for PVC

Home >  Products >  Plastic Extrusion Machine >  Extruding Hot Die Face Granulating Line for PVC

Extruding Hot Die Face Granulating Line for PVC

The PVC hot-cutting pelletizing production line is suitable for hot-cutting pelletizing of both PVC soft and hard materials. As advanced production equipment, it features high production output and precision.
Conical twin-screw  extruder:  Especially  suitable  for  high-output  production  of  PVC powder.
Pelletizing unit: Hot cutting at the die surface ensures pellet integrity.
Auxiliary equipment: Pellet cooling and classification.

Product Description

Extruding Hot Die Face Granulating Line for PVC factory

Extruding Hot Die Face Granulating Line for PVC details

Extruding Hot Die Face Granulating Line for PVC supplier

Extruding Hot Die Face Granulating Line for PVC details

Extruder Model

SJSZ51/105

SJSZ65/132

SJSZ80/156

SJSZ92/188

Main Motor Power(kW)

22

37

55

110

Capacity(kg/h)

120

250

450

800

Get a Free Quote

Our representative will contact you soon.
Email
Name
Country/Region
Company Name
Message
0/1000
  • As established in 1998, we are a national high-tech factory specializing in plastic industry.
  • Yes, the poducts quality is controlled under the ISO9001-2015 quality management system and CE European certification. The enterprise has received numerous national and provincial certifications and has established graduate cooperation stations with universities.
  • Our products come with a one-year warranty and lifetime technical support.
  • 30% TT down Payment,70% TT before Shipment. The delivery time depends on the product type. For production lines, the delivery period is generally 60–90 days, while for other standalone machines, it is 30–45 days.
  • We will dispatch 1 engineer from the seller to the buyer's factory for installation, commissioning and training, the buyer should be responsible for the cost of two-way flight tickets, the room and board and local area transportation, and allowance USD 80/day for the engineer. The customer has to supply skilled workers (mechanical fitters as well as electricians) in a sufficient number.

Get a Free Quote

Our representative will contact you soon.
Email
Name
Country/Region
Company Name
Message
0/1000