Requesting a Call:

8613506224031

Online Support

[email protected]

Visit Our Office

Jinfeng Sanxing Economic-developing-zone, Zhangjiagang City, Suzhou City, Jiangsu Province, China

Get a Free Quote

Our representative will contact you soon.
Email
Name
Country/Region
Company Name
Message
0/1000

Crusher & Shredder

Home >  Products >  Plastic Recycling Machine >  Crusher & Shredder

Double Shaft Shredder(Soft Material)

Unique parallel double shaft shredding system, synchronous centripetal rotating, ensure shredding coordination and stability.
Moving knife adopts four angles structure, perfectly matched with serration fixed knife. Realize high capacity and small output size.
Equipped with two independent power system, low rotation rate and high torque, avoid winding and stuck.
Electrical system adopts PLC program, features start, stop, reverse functions along with automatic overload return mechanism to prevent damage to working parts. Lower labor intensity and longer machine service life.

Product Description

Double Shaft Shredder(Soft Material) factory

Model

SS-600A

SS-800A

SS-1000A

SS-1200A

Shaft Diameter(mm)

350x2

350x2

400x2

400x2

Moving Knife Qty(pcs)

76

92

108

120

Fixed Knife Qty(pcs)

8

8

8

8

Max Capacity(kg/h)

750

950

1250

1500

Motor Power(kW)

30x2

37x2

45x2

55x2

Chamber Size(mm)

660x950

860x950

1060x1030

1260x1030

Get a Free Quote

Our representative will contact you soon.
Email
Name
Country/Region
Company Name
Message
0/1000
  • As established in 1998, we are a national high-tech factory specializing in plastic industry.
  • Yes, the poducts quality is controlled under the ISO9001-2015 quality management system and CE European certification. The enterprise has received numerous national and provincial certifications and has established graduate cooperation stations with universities.
  • Our products come with a one-year warranty and lifetime technical support.
  • 30% TT down Payment,70% TT before Shipment. The delivery time depends on the product type. For production lines, the delivery period is generally 60–90 days, while for other standalone machines, it is 30–45 days.
  • We will dispatch 1 engineer from the seller to the buyer's factory for installation, commissioning and training, the buyer should be responsible for the cost of two-way flight tickets, the room and board and local area transportation, and allowance USD 80/day for the engineer. The customer has to supply skilled workers (mechanical fitters as well as electricians) in a sufficient number.

Get a Free Quote

Our representative will contact you soon.
Email
Name
Country/Region
Company Name
Message
0/1000